Kent includes many homes where extensions, loft conversions and boundary work can raise Party Wall questions. Whether notice is needed depends on the proposed work: a new wall on the line of junction, work to a party structure, or an excavation that meets the Section 6 distance-and-depth tests. A postcode or project label does not decide the issue.
The three notices that apply in Kent (and everywhere in England and Wales)
- Section 1 — new walls on or at the boundary (one month's notice)
- Section 3 — works to a shared wall or structure, like loft conversion steels or chimney breast removal (two months' notice)
- Section 6 — excavation within 3 metres of a neighbouring building and below its foundations, or within 6 metres where the excavation intersects the relevant 45-degree plane (one month's notice, drawings required)
The law is national, so a notice generated online is exactly as valid in Maidstone or Margate as one drafted by a local firm — what matters is that the contents are correct. Our generator produces compliant notices from £30 each, with the response forms your neighbour needs to consent.
Party wall surveyors covering Kent
For Section 3 and Section 6 notices, an express dissent or no written consent within 14 days can start the surveyor process. Section 1 proposals for a wall astride the boundary have a separate written-consent rule. Our panel includes experienced party wall surveyors covering Kent whose professional qualifications and memberships include RICS, the Faculty of Party Wall Surveyors, and the Pyramus & Thisbe Society:
- Party wall surveyors in Canterbury (CT)
- Party wall surveyors in Medway (ME)
- Party wall surveyors in Tunbridge Wells (TN)
- Party wall surveyors in Dartford (DA)
- Party wall surveyors in Bromley (BR)
Or search by your own postcode to see who covers your street.
Typical Kent scenarios
- Rear extension on a Medway terrace: Section 6 may apply to the foundations if the statutory distance-and-depth test is met; Section 1 is a separate question for a new flank wall on the line of junction.
- Loft conversion in a Dartford semi: Section 3 notice for the steel beams bearing into the party wall — two months before works.
- New boundary wall in Canterbury: Section 1 notice, one month before building at the line of junction.
Start with the free 60-second checker to confirm what your project needs, then generate your notices — ready to serve the same day.
